ConocoPhillips Norway - VentureGuard™-H 1574CW

Documenting installation properties/durability. Venture Guard-H 1574CW self-adhesive, non-metallic cladding

Reference:
Norsok Standard Insulation of pipes and equipment R-004 revision 2. June1 999 paragraph 4.3.7.4 Installation.

Place/date for installation:
Ekofisk field center, April 2006

Installation owner:
ConocoPhillips Norway & partners

Responsible representative inst. owner:
Andrew Greig

Responsible insulation company:
D&F Group (former Bjørge Norcoat) by Geir Ramsvik

Executive entrepreneur:
D&F Group by Insulation Foreman Øyvind Josdal

Test piece:
VentureGuard-H 1574cw on 114,3mm pipe and eventual equipment, 6" valve in area U-30/40. Line: J -710-786-AD11-4.00-WF-4 (fire water). Length approximately 20m.

Substrate:
40mm foamglass sealed with self-adhesive aluminium foil, type Venture Clad 1577 cw.

Test site:
EkoJ, outdoor towards south-west, very weather exposed.

Weather conditions at installation:
Cloudy, a little wind. Temp 8-10°C RH 82%.

Durability:
The test installation was completed in April2 006. Still it appears irreproachable, after close to 2 years exposure to weather.

Classification of installation properties

VentureGuard-H 1574cw has very good installation properties

Image of Case Studies

Comments

"VentureGuard-H 1574cw (VGH) turned out to be good and quite simple to install. VGH is elastic, strong and it is easy to remove the protective paper (polyethylene reinforced, siliconated and humidity stable paper) from the adhesive.

VGH is adjustable during installation, it maybe loosened and lifted from the substrate until it has its corrected position and finally maybe fixed on to the substrate.

VGH has an appropriate thickness and covers/smoothens out small unevenness/roughness from the substrate."

Ekofisk, 09 February2 008
Øyvind Josdal
Insulation Foreman/D&F Group Stavanger AS


"VentureGuard-H 1574cw has passed pilot testing as suitable for installation. The Pilot project has been a success."

Geir Ramsvik
Project Leader Ekofisk D&F Group Stavanger AS


"VentureGuard-H 1574cw has successfully passed pilot testing on installation suitability According to Norsok paragraph 4.3.7.4 installation under conditions mentioned above."

Andrew Greig
ConocoPhillips
Staff engineer

Note: This English version of the report has been translated from original Norwegian by Tema bolerlngsprodukter, Tema lsoleringsprodulcer AS takes no responsibility for any consequence due to eventual translation failures.